|
In terms of its construction, the fact that a property is listed has no bearing on the survey, however, you should be aware that listed building consent is required for all works of demolition, alteration or extension to a listed building, where this will affect its character as a building of special architectural or historic interest. The requirement applies to all types of works and to all parts of the building (internal and external) and grounds. It is a common misunderstanding that the special interest of a listed building lies only in its features, such as windows or fireplaces. The history, architecture, general form and layout of the building may be as important in this regard as any individual feature. Whether an element is 'original' to the house or not is also not important, as later additions can be considered part of the ‘story’ of the evolution of the property over time, and can still be considered of special interest.
As part of the pre-survey research and site survey, an assessment will be made of any alterations and whether the correct permissions were obtained. It is a criminal offence to fail to apply for consent when required, and there are no time limits for enforcement action where there has been a breach of listed building control. Enforcement action can be taken against the owner of the property, irrespective of whether that person was the owner when the breach was committed. A thorough assessment ensures that you will not become liable for previous unauthorised works and any costs of rectification. |
Below are just a few examples of listed buildings I have previously surveyed
|